Emmitsburg Town Manager May 2007 Report

July 1, 2007 at 4:51 pm | Posted in Emmitsburg, Hold that line!, Laying it the line ;-), Lineup, One-liner, water line | Leave a comment

Here is the May 2007 Town Managers Report.Town Manager’s ReportMay 2007Prepared by David HallerStreets:Staff installed the ‘welcome to Emmitsburg’ signsStaff has repaired a number of street lightsStaff installed speed bumps on Lincoln Avenue and North AvenueStaff coordinated several street paving projectsStaff repaired and cold patched a few sidewalks on Main StreetWater:Rainbow Lake is maintaining at the spillway and all wells are holding up wellThe roughing filters are now being backwashed twice everyday and the DE filters are being done once every weekStaff has recently flushed the raw line from Rainbow Lake to the Water Treatment PlantWater production and consumption. We produced and purchased an average of 336,537 gpd. We consumed an average of 303,816 gpd.The difference is “Backwash Water” …(9.7%). We purchased 240,800 gals. of water from MSM this month.48.2% of this water came from wells0.2.4% of this water came from Mt. St. Mary’s49.4% of this water came from Rainbow LakeWastewater:Mason Dixon Farms has started pumping and aerator maintenance has been performed on Lagoon No. 3We received about 1.4 inches of precipitation this month (the average is 4,5 inches)We have a deficit of 3.7″ of precipitation over the last six months. The average precipitation for the period from December 1 thru May 31 is 22.2″ and we have received 18.5″ for that period.There was an error in last month’s precipitation computation which indicated that we had exceeded the six month average by 3.5% when we exceeded by only 0.8″. It is also important to know that this six month average does not include Nov. 2006, a month in which we exceeded the monthly average precipitation by 1.4″Wastewater Treatment:We treated an average of 286,000 gpd (consumed 303,816 gpd) which means that 0.0% of the wastewater treated this month was “wild water”. This also indicat4es that approximately 67% of the 26,424 gpd increase in consumption this month went to outdoor useWe experienced no spills of untreated sewerage during the month of MayWe did not exceed the plant’s design capacity during the month of MayTrash:Trash pickup will remain Monday and Thursday for the Month of June, 2007Parks:Staff worked on the ball fields in Memorial ParkStaff coordinated and worked with S&W Construction on the replacement of the roofs on the Bathrooms and pavilion in Memorial ParkStaff coordinated the pouring of the concrete for the new bandstand in Community ParkStaff did some painting at the Community swimming poolMeetings Attended:05/05 With Hess Enterprises related to possible rezoning request at hotel site05/07 With sewer plant design engineers related to possible treatment methods05/09 With staff to review water capacity numbers05/10 With Dan Reaver related to his proposed commercial subdivision05/15 With Planning consultant to create water capacity section of Comp Plan update05/16 Water & Sewer Master Plan seminar-Hagerstown05/17 With Mayor and Representatives of MSM to discuss growth limits delineation05/24 Municipal/BOCC Water & Sewer Master Plan update05/24 MML POS funding meeting (Got $70,000 of POS money

Blog at WordPress.com.
Entries and comments feeds.